Written by Anita Dangova, EPI, EECFA Bulgaria
Bulgaria’s Recovery and Resilience Plan (RRP) aims to facilitate economic and social recovery from the COVID-19 crisis and to create a more sustainable, equitable, and successful economy. It includes a set of schemes not only to restore the economy’s growth potential, but to boost it, too. In achieving this, several construction projects to increase energy efficiency and decrease CO2 impact are to be implemented in 2023-2026.

How the RRP will impact housing construction
One of the major projects provides support for sustainable energy-efficient renovation of the housing stock since, currently, only 7% of the floor area of occupied residential buildings complies with modern energy efficiency (EE) requirements. The project, to be launched by end 2022 with an implementation period till 2026, will attract a total of EUR 607mln under the Recovery and Resilience Facility (RRF). Multi-family residential buildings will be eligible for financing nationwide and renovated units have to achieve 30% primary energy savings. Residential buildings to be financed under this scheme are divided into two groups depending on the time of application of owners’ associations:
- applications until March 2023: 100% of the project funding will be provided from the RRP,
- applications from April 2023 to December 2023: 80% of the project funding will be provided under the RRP, and 20% will be in the form of self-contribution.
Another project with an implementation period till 2025 is dubbed “Program for the financing of single renewable energy measures in single-family and multi-family buildings”. Total planned funding is EUR 123mln (EUR 72mln from the RRP and EUR 51mln in the form of national and private co-financing). The project aims to increase the use of renewable energy in final energy consumption in households by financing new solar systems for domestic hot water and photovoltaic systems. There are two measures:
- construction of solar systems for domestic hot water supply. The maximum amount of grant per individual household is to be 100% of the cost of the system, but no more than EUR 1000;
- construction of photovoltaic systems up to 10 kW. The maximum amount of grant per individual household is to be up to 70% of the system cost, but no more than EUR 7700.
How non-residential construction will benefit from the RRP
One of the projects finances – between 2022 and 2026 – the sustainable energy renovation of non-residential buildings owned by municipalities and national authorities (regional administrations, ministries); the Bulgarian Academy of Sciences; public-private partnerships for buildings in the field of production, trade and services; non-profit legal entities, municipal enterprises, and commercial companies. The project consists of two components: 1) EUR 189mln (without VAT) to public buildings; 2) EUR 120mln (without VAT) for manufacturing, commercial and service buildings.
Continue reading What opportunities the RRF can bring to Bulgaria’s construction