Site icon EECFA – Buildecon

Bulgaria C-19 situation in construction (status on 15 April 2020)

Written by Yasen Georgiev and Dragomir Belchev, EPI – EECFA Bulgaria

Physical restrictions

There is no curfew or full lockdown, but there are some physical restrictions most important of which are:

The state of emergency, firstly announced on March 13, along with restrictive measures regarding COVID 19, were extended to May 13, 2020.

Construction works

According to the Association of Construction Entrepreneurs, there are no frozen residential construction sites, but it is hard to imagine that the work is going to continue with the same volumes. Additionally, obtaining construction permits is becoming increasingly difficult despite the effort of municipalities to introduce e-services.

Construction works of largest infrastructure projects continue at present, but with slower pace since there are difficulties in deliveries of construction materials. Delays are expected on the Bulgarian part of ‘TurkStream’ due to the obligatory 14-day quarantine for foreign workers who are employed on the site.

We are planning to issue the new EECFA Bulgaria Construction Forecast Report on 29 June 2020. Sample report and order

Anticovid measures in construction

There are no specific anticovid measures regarding the construction sector. Most important current economic measures implemented by the government include:

Exit mobile version